Experienced site manager with a proven track record in site supervision, consistently delivering projects ahead of schedule and under budget. Demonstrates strong resourcefulness and reliability, focusing on profitability and safety. Expertise in managing diverse teams and optimizing resources for maximum efficiency.
Overview
11
11
years of professional experience
1
1
Certification
Work History
Construction manager (Infrastructure)
INFRACON Co
Cairo
09.2023 - Current
Ain Sokhna touristic road-District 5 (MARAKEZ) Extension fast track project infrastructure works (D5E23CON09-CA-Sub-InfraCon-0038) Contract No. (120M EGP) consists of four parcels (A5, A6, H4, F) for sewage, water, irrigation, and firefighting works on site. Program Owner: MARAKEZ.
Resolved complex project site challenges through effective guidance and support.
Interfaced with clients during meetings and supplied essential statistical data.
Led a capable team of Site Engineers to ensure high-quality work on-site.
Handled staffing coordination, task assignments, and personnel training initiatives.
Implemented performance reviews alongside developmental strategies for employees.
Recommended tailored adjustments to project control systems for better alignment.
Monitored daily, weekly, and monthly productivity metrics to enhance efficiency.
Realized a 45% boost in execution efficiency while maintaining budget and timeline integrity.
Construction Manager
Wady El-Nile contracting & Real-estate Investments Co
Damanhur
04.2021 - 01.2023
Managed infrastructure projects across 11 villages, including sewage and water systems.
Oversaw installation of over 103 kilometers of sewage and 20 kilometers of water lines.
Monitored safety plans, work quality, and timelines to meet project objectives.
Evaluated productivity rates daily, weekly, and monthly to maximize output from site teams.
Conducted periodic meetings to address concerns and requests from project personnel.
Participated in weekly meetings and site inspections with project manager and owner.
Administered invoices, inventory, materials delivery, interim payments, and funding requests.
Delivered daily incident reports to top management to facilitate informed decision-making.
Site Manager
SHEHAB contracting & infrastructure Co
Beheira
05.2018 - 03.2021
Directed oversight of over 45 kilometers of wastewater collection construction, ensuring adherence to all regulatory standards.
Achieved a 45% increase in efficiency while managing project timelines and quality control measures.
Monitored productivity rates daily, weekly, and monthly to secure maximum output from teams on site.
Facilitated regular meetings to convey concerns and requests among project stakeholders.
Administered invoices and materials logistics alongside revenue expectations for accurate financial planning.
Compiled daily reports on incidents for senior management review to promote transparency.
Implemented safety plans in compliance with local/national codes throughout the execution process.
Supported European Union financing project as assistant manager, enhancing operational effectiveness.
Senior Site Engineer
AZIZ FOR Industrial and Contracting Investment
Riyadh
08.2016 - 01.2018
Monitored and managed irrigation emron pipelines of 1200 and 800 in Sodoos region, Riyadh.
Supervised subcontractors and ensured compliance with safety standards.
Conducted regular site inspections to monitor progress and quality.
Prepared reports outlining problems encountered at the site and proposed solutions.
Inspected completed works to ensure that they meet all specifications and relevant codes of practice.
Ensured project adherence to timelines, quality, and safety plans for accurate goal achievement.
Evaluated daily, weekly, and monthly productivity rates to maximize output from site groups.
Prepared daily reports on various incidents for upper management review.
Motivated personnel to uphold safety measures and promote a culture of quality.
Site engineer, Field Engineer (Waste/Sewage)
HORSE Contracting Company
Beheira
09.2014 - 06.2016
The project includes over 25 kilometers of sewer systems, as well as wastewater treatment and pump station projects.
The main task is to monitor, operate, and manage the operation with respect to the project's time, working quality, and safety plans in order to achieve the requested goals accurately and on time.
Monitoring the daily, weekly, and monthly productivity rates in order to ensure getting the maximum outputs from the distributed groups on site.
Supervising 8 surveyors, 2 supervisors, 2 foremen, 6 charge hands, and over 200 laborers on the project in Egypt.
Pipeline installation, testing, and commissioning, including static and hydro testing.
A project site engineer for the World Bank-funded financing project.
Directed sewer construction activities spanning 25 km over an 18-month period by coordinating teams of 200+ personnel and utilizing Total Station and AutoCAD, resulting in a 15% reduction in project delays while meeting World Bank compliance standards.