Summary
Overview
Work History
Education
Skills
Accomplishments
Languages
Contacts
Locations
Personal Information
Timeline
Generic
DHIRAJ MISRA

DHIRAJ MISRA

Manama ,Bahrain

Summary

Accomplishedand result driven management level with 19 years of Versatiles comprehensiveachievements in project management, planning,Strategic Projects Execution,Commissioning of pot shell,Busbar, Cathode sealing shop,as well as start-up and reduction operations. Smelters, Innovation & Digitization including past 5 yrs refractory management role in a Multi-National Organization. Leveraged my unique blend of experience in Operations to unlockvalue to business & stakeholders by constantly looking out,identifying, conceptualizing and executing disruptive & value with new ideas for long term vision

Competent, diligent & result oriented professional with an experience more than 18 years in the field of Different Aluminum Smelters in Production,Operation,process control,Management,Pot-Lining, Refractory materials Planning & management and Project Execution and commissioning. project from start to end close out,Presently working as a "Reduction Specialist" in Aluminum Bahrain (ALBA with technology of Aluminum Pechiney, having capacity of 18 million ton

Overview

19
19
years of professional experience

Work History

Reduction Supervisor

Aluminum in Bahrain
, Bahrain
03.2018 - Current
  • Company Overview: ALBA Aluminum Pechiney Technology
  • Becoming largest Greenfield AP technology smelter project at single location for Aluminum production in the world targeting total annual production capacity of 18.5 million ton
  • Work as a Reduction Supervisor Aluminum smelter- Motto as in top priority 'ZERO' injury & 'ZERO' Discharge in Day by day operational activities, with concrete system as per GLUF smelter
  • Stabilize the pot as per Normalization, simultaneously parameters changes, process development, and daily basis tracking and sending Hot metal to cast house etc
  • Training and development of new people in smelter, with modification of tools and tackles for ease to work
  • 5s implementation at floor and sustaining from 2021
  • Looking HSE, innovation and modification of tools with all operational activities, technical parameters & Involved with Startup, stabilized the pots with minimum period for optimize the Energy, Daily basis monitoring production of liquid metal with minimum cost and also monitoring the monthly allocation budget, People development and modification, 5S etc
  • ALBA Aluminum Pechiney Technology
  • Becoming largest Greenfield AP technology smelter project at single location for Aluminum production in the world targeting total annual production capacity of 18.5 million ton

Manager

Vedanta Aluminum Ltd.
Jharsuguda, India
03.2015 - 04.2018
  • Company Overview: As a part of Vedanta Resource Plc, An London based LSE listed metal & mining major, VAL-J is the largest Greenfield smelter project at single location for Aluminum production in the world targeting total annual production capacity of 17.6 million ton
  • Previously worked as a Pot-line Manager in the Smelter Operation (340 KA barebacked GAMI Tech, in its Pot Room) of VEDANTA ALUMINIUM LTD
  • At Jharsuguda (Orissa), Which have 17.6 million ton production of Aluminum per Annam at a single location by 2017 (in world largest capacity of Aluminum smelter at a single location)
  • Work as a line manager in Aluminum smelter- Motto as in top priority 'ZERO' injury & 'ZERO' Discharge in Day by day operational activities & Fast going Pot ramp-up during dream start-up phase in Vedanta
  • Stabilize the pot as per Normalization charts & simultaneously parameters changes, process development etc Proper balancing of pot stabilization & simultaneously fast pot ramp-up in 3 Potlines (770 pots Start-up done)
  • Day bay day liquid metal planning, ramp-up planning
  • Analysis of pot parameters & metal purity analyzing
  • Optimize the energy consumption
  • Optimize the 'Energy saving pot' According to normalization table (Run with 3.98v & DC-12770 KWH/MT of AL)
  • SLA with other department mainly Cast House & Carbon
  • Resources management, asset optimization & quality of work, process improvement
  • Develop the people, training & new invention for easy/ safe work culture through QC, Kaizen & Cash-e
  • As a part of Vedanta Resource Plc, An London based LSE listed metal & mining major, VAL-J is the largest Greenfield smelter project at single location for Aluminum production in the world targeting total annual production capacity of 17.6 million ton

Manager

Mahan Aluminum Ltd.
Singrauli, India
12.2010 - 02.2015
  • Company Overview: Hindalco is setting up a green field aluminum smelter (0.36 MTPA) and CPP (6 X 150 MW) i.e
  • Mahan Aluminum & power at Singrauli, M.P with Smelter technology supplied by AP, France and detailed engineering Consultancy by EIL
  • Adept in instilling multi-skilling aptitude among workmen for performance enhancement; professional competencies in mobilizing and judiciously managing resources with structured inputs in the domains of production planning, scheduling and monitoring to ensure smooth production operations within defined time and cost parameters
  • Planning & executing HES inspection, following up HES on specific jobs during execution
  • & Ensuring zero incident & Analyzing if any with non repetition of that
  • Following up procedure w.r.t to adherence & after incident
  • Previously Associated with Hindalco Industries Limited (Aditya Birla Group) as a Manager-Technology responsible for Pot line project Execution and commissioning, operational shift activities inside the pot line which includes 32 hour production planning in pot room operation, with AP-36s technology, 360 KA
  • Hindalco is setting up a green field aluminum smelter (0.36 MTPA) and CPP (6 X 150 MW) i.e
  • Mahan Aluminum & power at Singrauli, M.P with Smelter technology supplied by AP, France and detailed engineering Consultancy by EIL

Associate Manager

Vedanta Aluminum Ltd.
Jharsuguda, India
12.2007 - 11.2010
  • Company Overview: As a part of Vedanta Resource Plc, An London based LSE listed metal & mining major, VAL-J is the largest Greenfield smelter project at single location for Aluminium production in the world targeting total annual production capacity of 4 million ton by 2012
  • Responsible for In Cell lining, shell alignment, installation of insulation bricks, casting and ramming (cold and hot) and complete inspection of pot shell before handover to start-up
  • Accountable for Preheat monitoring, bath pouring and metal pouring activities and parameter control of the pot in startup mode, Pot preparation activities like pots inspection, coke laying and anode setting, mounting of flexible and shunts and pot loading (start-up of 504 new pots & restart-up 162 pots)
  • Restarted-up after power outage with minimum interval (105 pots within 38 days)
  • Responsible for 152 Pot cells (4Section) Operational and Technical parameters
  • Work like:-Anode changing, metal tapping, Beam raising, breaker changing, Current efficiency, Metal Purity, Process Measurements & Improvements
  • Monitored process parameters, deviations & recommend corrective actions and Investigated technical problems & recommending solutions
  • Monitored excess Alf3%, bath temp, liquid levels, set voltages, cvd, cbt, SST, CCD & other voltage drop, ACD for 24hours, covering audit & prepared correction schedule
  • Streamline all Equipment's, Manpower & resources for Maximum production in daily basis
  • As per Business Plan, maintained production with Quality & Standard within stipulated Time
  • Ensure zero incidents & Analyzing if any with non repetition of that
  • As a part of Vedanta Resource Plc, An London based LSE listed metal & mining major, VAL-J is the largest Greenfield smelter project at single location for Aluminium production in the world targeting total annual production capacity of 4 million ton by 2012

Assistant Manager

Bharat Aluminum Ltd.
Korba, India
01.2006 - 11.2007
  • Company Overview: As a part of Vedanta Resource Plc, An London based LSE listed metal & mining major, BALCO is one of the largest Greenfield smelter project at single location for Aluminium production in the world targeting total annual production capacity of 2.5 million ton per year
  • Led the team of 12 executives & responsible for 36 pots operation and managed PTM & WMI (2 nos) cranes movement planning for 36 pots
  • Ensured Completion of scheduled work like Anode change, Anode covering, Beam raising, Metal tapping, Breaker Change, Bath correction & Alf3 feeling with ensuring all Sop's
  • Carried out Completion of bath addition & coke skimming schedule
  • Detection of faulty breakers, feeders & follow up
  • Controlled Anode effect frequency & duration with in desired range
  • Handled Liquid level measurement of 36 pots, Metal tapping recommendation, bath adjustment plan preparation & implementation
  • Involved in Production planning in a shift for Fulfill Customer Requirement & zero pending work; Maintained 5S for properly streamline all activities & proper utilization of Resources and Ensured zero incidents in shift & reporting if any with non repetition of that
  • As a part of Vedanta Resource Plc, An London based LSE listed metal & mining major, BALCO is one of the largest Greenfield smelter project at single location for Aluminium production in the world targeting total annual production capacity of 2.5 million ton per year

Education

B.Tech - Mechanical Engineering

West Bengal University of Technology
West Bengal
01.2005

Higher Secondary School Leaving Certificate -

Asansol Chelidanga High School
Asansol, West Bengal
01.2000

High School Leaving Certificate -

Asansol Chelidanga High School
Asansol, West Bengal
01.1998

Skills

  • Project Management
  • Operations Management
  • Process Control
  • Risk Management
  • Lean Production
  • Cost Management
  • Stakeholder Management
  • HSE and ESG

Accomplishments

  • Recognized as an outstanding performer & sent to China for Management cum Operational training on GAMI Technology.
  • Acknowledged with outstanding performer award in VEDANTA Aluminum Smelter Project at Jharsuguda & Balco Korba.
  • Received twice CEO kitty awards for best resource utilization.
  • Implemented the Modification of Metal Tapping Ladles resulting in running HENCON with 92% Efficiency.
  • Successful Erection, Commissioning & startup of Aluminum Pechiney (AP36) Technology based Ist Cathode Sealing Shop in India.
  • Achieved and sustained ZERO LTI (Lost Time Injury) throughout the career.

Languages

  • English
  • Hindi

Contacts

  • Phone, +973-38889137
  • Email, dhfire10@rediffmail.com
  • Email, dh.fire10@gmail.com

Locations

  • Bahrain, Bahrain
  • Jharsuguda, Orissa, Jharsuguda, Orissa
  • Singrauli, MP, Singrauli, MP
  • Korba, CG, Korba, CG

Personal Information

  • Passport Number: W1148873
  • Blood Group: O+ve
  • Date of Birth: 08/07/82
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Married

Timeline

Reduction Supervisor

Aluminum in Bahrain
03.2018 - Current

Manager

Vedanta Aluminum Ltd.
03.2015 - 04.2018

Manager

Mahan Aluminum Ltd.
12.2010 - 02.2015

Associate Manager

Vedanta Aluminum Ltd.
12.2007 - 11.2010

Assistant Manager

Bharat Aluminum Ltd.
01.2006 - 11.2007

B.Tech - Mechanical Engineering

West Bengal University of Technology

Higher Secondary School Leaving Certificate -

Asansol Chelidanga High School

High School Leaving Certificate -

Asansol Chelidanga High School
DHIRAJ MISRA