Summary
Overview
Work History
Education
Skills
Languages
Career Summary
Custom
Personal Information
Timeline
Generic
Geejo Paul

Geejo Paul

Chalakudy,India

Summary

Experienced professional in mechanical engineering with a strong background in piping fabrication, construction, and site supervision. Demonstrates expertise in resource allocation, quality assurance checks, and field inspection competence while ensuring strict adherence to health and safety standards. Skilled in client and subcontractor relations, technical activities, and troubleshooting piping issues, with a proven ability to deliver solutions through analytical thinking and effective decision-making. Adept at coordinating teams, supervising field construction projects, and maintaining high standards of communication to achieve project goals efficiently. Committed to upholding industry best practices and contributing to the successful execution of complex engineering projects.

Offering solid foundation in leadership and team coordination with experience in overseeing piping projects. Knowledgeable about safety protocols and quality control procedures. Strong communication and problem-solving abilities. Ready to use and develop skills in project management, compliance, and team leadership in Piping Supervisor/Superintendent role.

Motivated Piping Supervisor/Superintendent with 18 years of experience, recognised for assessing operational needs and developing solutions to save costs, improve revenues and drive customer satisfaction. Resourceful and well-organised with excellent leadership and team-building record.

Overview

22
22
years of professional experience

Work History

Piping Supervisor

TTSJV(Technip, Tecnicas Reunidas, Samsung)
Muharraq, Bahrain
09.2023 - Current

Joint Venture Project : BAPCO Modernization Program.

  • Fostered conducive working environment through effective communication and conflict resolution strategies.
  • Streamlined workflow by introducing efficient task delegation strategies amongst team members.
  • Coordinating and supervising installation, testing, and inspection of underground and above ground piping, pipe support, and all kinds of mechanical equipment.
  •  Piping Erection; >350000 inch diameters
     UG metallic/nonmetallic; >20000 m
  • Lead and manage site construction team and subcontractors, ensuring all works are executed in time, within contractual, quality and safety standards.
  • Leading daily coordination meetings with discipline leaders, discussing progress and resolving technical and schedule issues.
  • Conducting interface and site coordination meetings with client for activities to be executed in Brownfield as well as locations where existing Brownfield assets cross Greenfield locations, ensuring to follow Brownfield procedures and requirements.
  • Developing Brownfield Risk Assessment and Method Statement coordination meetings between Refinery operation team, PMT and Construction team.
  • Driving interface coordination meetings and working with local stakeholders to guarantee project milestones completion, ensuring to follow local operating policies and procedures.
  • Leading daily coordination meeting with construction and handover team to ensure Mechanical Completion Certificates & Ready for Start Up target completion.
  • Reporting and coordinating with site engineering team discrepancies found in drawings and PID´s and implementing action to solve them.
  • Supervising and managing site construction activities carried out by subcontractors.
  • Conducted thorough inspections of piping systems, maintaining high safety standards.
  • Implemented safety protocols during construction projects, reducing workplace accidents.
  • Coordinated with other supervisors for smooth operations across departments.
  • Supervising and managing site construction activities carried out by subcontractors and this includes ensuring that subcontractors are meeting their contractual obligations and that their work is of high quality
  • Ensuring that all site activities adhere to legal regulations, including environmental regulations and safety regulations
  • Understanding P&IDs and relevant drawings
  • Conducting site surveys to propose new routes and locations for facilities and preparing layout to analyze space requirement
  • Preparing material list depicting all material, sizes, specification, special requirement, testing requirements to meet design. This list should include size, specification, and special requirements for each item
  • Conducting weekly HSE assessments and safety walk through, safe, and unsafe auditing.
  • Conduct pressure test package walk down and generating punch points, clearing of punch points prior and after pressure test. This involves inspecting piping system to ensure that it is ready for pressure testing, identifying, and correcting any deficiencies, and verifying that all punch points have been cleared before and after test
  • Inspection of pressure tests such as pneumatic test and hydro test
  • Conduct system walks down and gives declaration about all kind of modifications are completed and closing of client punch points also.
  • Pressure test of all kinds of piping, air blowing, bolt torquing and reinstatement of all system also handled.
  • Includes developing work schedules, assigning tasks to team members, and monitoring progress to ensure that deadlines are met.
  • Responsible for shutdown and tie in activities-50 tie ins.
  • Generating Red Mark Ups and AS BUILT drawing were also part of assignment.
  • Pressure test of all kinds of piping, air blowing, bolt torquing and reinstatement of all system also handled.
  • Clearing of all punches belongs to subsystem mechanical completion in order to achieve MC for subsystem.
  • Clearing of all punches belongs to subsystem in order to achieve RFC for subsystem.
  • Supervising and managing site construction activities carried out by subcontractors

Piping Supervisor

Technip, NESTE Expansion, Ali
Tuas South, Singapore
03.2020 - 12.2022
  • Fostered conducive working environment through effective communication and conflict resolution strategies.
  • Streamlined workflow by introducing efficient task delegation strategies amongst team members.
  • Coordinating and supervising installation, testing, and inspection of underground and above ground piping, pipe support, and all kinds of mechanical equipment.
  •  Piping Erection; >150000 inch diameters  UG metallic/nonmetallic; >2000 m
  • Lead and manage site construction team and subcontractors, ensuring all works are executed in time, within contractual, quality and safety standards.
  • Leading daily coordination meetings with discipline leaders, discussing progress and resolving technical and schedule issues.
  • Conducting interface and site coordination meetings with client for activities to be executed in Brownfield as well as locations where existing Brownfield assets cross Greenfield locations, ensuring to follow Brownfield procedures and requirements.
  • Developing Brownfield Risk Assessment and Method Statement coordination meetings between Refinery operation team, PMT and Construction team.
  • Driving interface coordination meetings and working with local stakeholders to guarantee project milestones completion, ensuring to follow local operating policies and procedures.
  • Leading daily coordination meeting with construction and handover team to ensure Mechanical Completion Certificates & Ready for Start Up target completion.
  • Reporting and coordinating with site engineering team discrepancies found in drawings and PID´s and implementing action to solve them.
  • Supervising and managing site construction activities carried out by subcontractors.
  • Conducted thorough inspections of piping systems, maintaining high safety standards.
  • Implemented safety protocols during construction projects, reducing workplace accidents.
  • Coordinated with other supervisors for smooth operations across departments.
  • Supervising and managing site construction activities carried out by subcontractors and this includes ensuring that subcontractors are meeting their contractual obligations and that their work is of high quality
  • Ensuring that all site activities adhere to legal regulations, including environmental regulations and safety regulations
  • Understanding P&IDs and relevant drawings
  • Conducting site surveys to propose new routes and locations for facilities and preparing layout to analyze space requirement
  • Preparing material list depicting all material, sizes, specification, special requirement, testing requirements to meet design. This list should include size, specification, and special requirements for each item
  • Conducting weekly HSE assessments and safety walk through, safe, and unsafe auditing.
  • Conduct pressure test package walk down and generating punch points, clearing of punch points prior and after pressure test. This involves inspecting piping system to ensure that it is ready for pressure testing, identifying, and correcting any deficiencies, and verifying that all punch points have been cleared before and after test
  • Inspection of pressure tests such as pneumatic test and hydro test
  • Conduct system walks down and gives declaration about all kind of modifications are completed and closing of client punch points also.
  • Pressure test of all kinds of piping, air blowing, bolt torquing and reinstatement of all system also handled.
  • Includes developing work schedules, assigning tasks to team members, and monitoring progress to ensure that deadlines are met.
  • Responsible for shutdown and tie in activities-50 tie ins.
  • Generating Red Mark Ups and AS BUILT drawing were also part of assignment.
  • Pressure test of all kinds of piping, air blowing, bolt torquing and reinstatement of all system also handled.
  • Clearing of all punches belongs to subsystem mechanical completion in order to achieve MC for subsystem.
  • Clearing of all punches belongs to subsystem in order to achieve RFC for subsystem.
  • Supervising and managing site construction activities carried out by subcontractors

Piping Engineer

ENOC Refinery Expansion Project
Jebel Ali, Dubai,U.A.E
11.2017 - 02.2020
  • Coordinating piping, fabrication and erection activities, manpower, equipment allocations and material arrangement to work groups as per erection schedule
  • Updating daily fabrication reports, daily erection reports, manpower and equipment deployment reports etc
  • Responsible for fabrication works of underground piping spools at fabrication yard
  • Responsible for shutdown and tie in activities-50 tie ins
  • Generating Red Mark Ups and AS BUILT drawing were also part of assignment
  • Pressure test of all kinds of piping, air blowing, bolt torquing and reinstatement of all system also handled

Piping Engineer

Ruwais–Pig Trap System for 6''(C3) and 20'' (C2)
Ruwais, U.A.E
12.2013 - 04.2014
  • Coordinating piping, fabrication and erection activities, manpower, equipment allocations and material arrangement to work groups as per erection schedule
  • Involved in material management, spool release and its movement as per erection requirements
  • Updating daily fabrication reports, daily erection reports, manpower and equipment deployment reports etc
  • Responsible for fabrication works of piping spools at fabrication yard
  • Preliminary line punching and preparation of punch lists, coordinating with Contractor representatives for line walk downs and pressure tests
  • Responsible for shutdown and tie in activities-05 tie ins
  • Responsible for arranging and coordinating all kinds of permits like construction permits, PMC permits, hot work permits, radiography permits
  • Coordinate with Quality department for all QC inspections of piping and painting
  • Generating Red Mark Ups and AS BUILT drawing were also part of assignment

Piping Engineer

Procurement & installation of NGL Pipeline pumps
Asab, U.A.E
03.2013 - 12.2013
  • Coordinating piping, fabrication and erection activities, manpower, equipment allocations and material arrangement to work groups as per erection schedule and involved in material management, spool release and its movement as per erection requirements
  • Updating daily fabrication reports, daily erection reports, manpower and equipment deployment reports etc
  • Responsible for fabrication works of piping spools at fabrication yard
  • Preliminary line punching and preparation of punch lists, coordinating with Contractor representatives for line walk downs and pressure tests
  • Responsible for shutdown and tie in activities-16 tie ins (13 weld joints tie ins and 3 fire water (GRP) tie ins
  • Responsible for arranging and coordinating all kinds of permits like construction permits, PMC permits, hot work permits, radiography permits and GASCO permits
  • Coordinate with Quality department for all QC inspections of piping and painting
  • Generating Red Mark Ups and AS BUILT drawing were also part of assignment
  • Organization : ACC Project : Strategic Water Storage and Recovery Project

Piping Engineer

Strategic Water Storage and Recovery Project
Liwa, U.A.E
10.2012 - 02.2013
  • Coordinating piping, fabrication and erection activities, manpower, equipment allocations and material arrangement to work groups as per erection schedule
  • Involved in material management, spool release and its movement as per erection requirements
  • Updating daily fabrication reports, daily erection reports, manpower and equipment deployment reports etc
  • Responsible for fabrication works of piping spools at fabrication yard
  • Responsible for trench clearance and after installation of pipelines, coordinating with QC department painting and wrapping of joints and release for backfilling joints

Piping Engineer

GASCO 4th NGL TRAIN PROJECT
Ruwais, QATAR
02.2012 - 09.2012
  • Coordinating piping, fabrication and erection activities, manpower, equipment allocations and material arrangement to work groups as per erection schedule
  • Involved in material management, spool release and its movement as per erection requirements
  • Updating daily fabrication reports, daily erection reports, manpower and equipment deployment reports etc
  • Pressure test of inergen piping, puff test of inergen system also handled
  • Responsible for fabrication works of inergen piping spools at fabrication yard
  • Preliminary line punching and preparation of punch lists, coordinating with Contractor representatives for line walk downs and pressure tests
  • Installation of nozzles and pre-commissioning activities managed
  • Responsible for arranging and coordinating all kinds of permits like construction permits, PMC permits, hot work permits, radiography permit and JV permits)
  • Coordinate with Quality department for all QC inspections of piping and painting
  • Generating Red Mark Ups and AS BUILT drawing were also part of assignment
  • WGI/AJES CONSORTIUM Project : COMMON SULFUR PROJECT, RAS

Piping Engineer

COMMON SULFUR PROJECT
Ras Laffan, Qatar
09.2007 - 12.2011
  • Coordinating piping, fabrication and erection activities, manpower, equipment allocations and material collection
  • Generating AS BUILT drawing and material management, spool release and its movement and updating daily fabrication reports
  • Responsible for fabrication works of process and utility lines including cement lined CS pipes used for fire water system
  • Responsible for steam tracing of non-jacketed areas of jacketed line and preparation of daily reports, weekly reports, and productivity reports
  • Responsible for installation of sump pumps and their preservation and alignment
  • Responsible for arranging permit to work like construction permits PMC permits, Qatar Gas permits-cold work permit, hot work permit, open flame work permit, confined space entry permit, excavation permit and radiography permit and RLIC permits

Piping Engineer

CTJV Qatar Gas Onshore Expansion Project, Train 4
Ras Laffan, India
01.2005 - 08.2007
  • Inspection for fabrication of all type of piping
  • Review project quality management and ITP
  • Preparation of isometric drawings and network data sheet for construction works
  • Inspection for fabrication and Erection of Piping
  • Preparation of QC documents and packages for testing
  • Attend daily, weekly and event driven meetings
  • Liaison with client and subcontractors
  • Providing feedback to subcontractors to achieve target
  • Completion of site works safely in scheduled time
  • Preparation and verification of AS BUILT drawing
  • Liaise with client for contractual enquiries and variations.

Piping Engineer

M/S Craft Engineering, Kochi Refineries Ltd
Kochi,Kerala, Qatar, India
10.2004 - 07.2007
  • Inspection for fabrication of all type of piping and welding
  • Preparation of QC documents and packages for testing
  • Punch list preparation and line checking
  • Attend daily, weekly and event driven meetings
  • Preparation and verification of AS BUILT drawing
  • Checking piping isometric drawings with P&ID and GA for approving drawings for Hydro testing
  • Co-ordinate with Quality department for NDT activities for hydro testing clearance.

Piping Supervisor

M/S, Reliance Industries Ltd
Nagar
10.2003 - 10.2004

L&T ECC

  • Liaise with client for contractual enquiries and variations
  • Planning of piping jobs and executing same during construction period
  • Preparation of isometric drawings and network data sheet for construction works
  • Fabrication and Erection of Piping
  • Planning for manpower and equipment
  • Preparation of QC documents and packages for testing
  • Attend daily, weekly and event driven meetings
  • Planning of manpower and equipment
  • Completion of site works safely in scheduled time
  • Preparation and verification of as built drawings.

Construction Supervisor - Piping (Trainee

P&N Constructions Pvt. Ltd, Apollo Tyres Ltd
Kochi,Kerala, India
10.2002 - 09.2003
  • Engaged in various fabrication works of pipes, supports, and structures.
  • Received training in various works such as welding, cutting, grinding, fabrication and erection.
  • Acquired well experience in implementing working procedures, manpower and equipment allocations, site management and in health safety and environmental issues.

Education

Bachelor of Technology - Mechanical Engineering

Kalinga University
Raipur, Chhattisgarh

Diploma - Mechanical Engineering

Thiagarajar Polytechnic
Alagappanagar, Kerala
06.2002

Skills

  • Site supervision
  • Coordination
  • Client relations
  • Technical activities
  • Problem solving
  • Analytical thinking
  • Mechanical engineering
  • Communication skills
  • Supervisory experience
  • Quality assurance checks
  • Coding standards familiarity
  • Field inspection competence
  • Technical reports writing
  • Troubleshooting piping issues
  • Decision-Making capability
  • Health and Safety Compliant
  • Fault-finding
  • Health and safety standards adherence
  • Technical drawing interpretation
  • Material selection acumen
  • Project management

Languages

English
Hindi
Malayalam
Tamil

Career Summary

20 years total experience and 16 ½ years overseas experience specialized in Industrial Piping of Petrochemical plants, inergen piping, water transmission pipelines, pumping stations, desalination plants& Refinery plant construction field, in all the phases and pre-commissioning activities.

Custom

  • +917034012433
  • +919061159844

Personal Information

  • Passport Number: N-6511593
  • Passport Date Of Issue: 01/18/16
  • Passport Place Of Issue: Cochin
  • Date of birth: 12/26/81
  • Nationality: Indian
  • Marital status: Married
  • Religion: Christian

Timeline

Piping Supervisor

TTSJV(Technip, Tecnicas Reunidas, Samsung)
09.2023 - Current

Piping Supervisor

Technip, NESTE Expansion, Ali
03.2020 - 12.2022

Piping Engineer

ENOC Refinery Expansion Project
11.2017 - 02.2020

Piping Engineer

Ruwais–Pig Trap System for 6''(C3) and 20'' (C2)
12.2013 - 04.2014

Piping Engineer

Procurement & installation of NGL Pipeline pumps
03.2013 - 12.2013

Piping Engineer

Strategic Water Storage and Recovery Project
10.2012 - 02.2013

Piping Engineer

GASCO 4th NGL TRAIN PROJECT
02.2012 - 09.2012

Piping Engineer

COMMON SULFUR PROJECT
09.2007 - 12.2011

Piping Engineer

CTJV Qatar Gas Onshore Expansion Project, Train 4
01.2005 - 08.2007

Piping Engineer

M/S Craft Engineering, Kochi Refineries Ltd
10.2004 - 07.2007

Piping Supervisor

M/S, Reliance Industries Ltd
10.2003 - 10.2004

Construction Supervisor - Piping (Trainee

P&N Constructions Pvt. Ltd, Apollo Tyres Ltd
10.2002 - 09.2003

Bachelor of Technology - Mechanical Engineering

Kalinga University

Diploma - Mechanical Engineering

Thiagarajar Polytechnic
Geejo Paul