Summary
Overview
Work History
Education
Skills
Certificatesandlicenses
Traininganddevelopmentcourses
Emailaddresses
Phonenumbers
Languages
References
Timeline
Generic
Jeetendra Gupta

Jeetendra Gupta

Mahooz

Summary

Highly skilled Senior Electrical Engineer with broad experience in managing all phases of electrical engineering projects. Strengths include strong problem-solving skills, innovative design and system optimization. Notable impact achieved through successful project completion and implementation of cost-effective solutions. Demonstrated ability to lead teams, meet deadlines and work under pressure while maintaining high safety standards.

Overview

22
22
years of professional experience

Work History

Sr. Electrical Engineer, Distribution & Network Construction

Electricity and Water Authority
Manama
10.2017 - Current
  • Ensured clarity and accuracy in financial oversight by developing and executing comprehensive work and budget status reports on a regular basis (weekly, monthly, quarterly, annually).
  • Optimized resource utilization by allocating adequate budgets for material and labor costs.
  • Ensured compliance with EDD standards and safety protocols to create a secure operational environment.
  • Ensured seamless job execution and collaboration through effective coordination with external ministerial departments and internal EWA divisions.
  • Monitored and prioritized the timely completion and closure of jobs in accordance with EWA's operational priorities and objectives.
  • Requested modifications/updates for system tools (SAP, GIS, EAM, etc.) To optimize job execution efficiency and enhance reporting capabilities.
  • Provided strategic recommendations and suggestions to senior management, enhancing operational effectiveness.
  • Provided technical support to project teams in the development of new product designs.
  • Reviewed engineering drawings for accuracy and completeness prior to production release.
  • Monitored progress of projects to ensure deadlines were met within budget limitations.
  • Optimized performance of existing systems through software updates.
  • Developed electrical schematics and diagrams for complex systems.
  • Analyzed system designs to ensure compliance with applicable codes and standards.
  • Evaluated existing electrical systems for safety issues and potential upgrades and improvements.
  • Prepared cost estimates for various projects based on labor hours, material costs.
  • Issued documents and drawings on time to minimize project lags and delays.
  • Developed and maintained project documentation, including design notes, calculations, and reports.
  • Utilized CAD software to create and revise electrical schematics and layouts.
  • Oversaw the installation, testing, and commissioning of electrical systems, ensuring adherence to safety and quality standards.
  • Specified and sourced electrical components and equipment, ensuring compatibility and compliance with project requirements.

Sr. Electrical Engineer, Operation & Maintenance (Emergency Depot, Muharraq)

Electricity and Water Authority
Manama
01.2012 - 10.2017
  • Analyzed HV and LV distribution networks for identification and minimization of cable faults by strategically replacing cables or equipment
  • Maintained adequate stock of materials necessary for daily operational activities
  • Reviewed, monitored, and provided guidance on corrective actions for LV and HV circuits in addition to substation operations
  • Prepared detailed cost estimations for the replacement and reinforcement of LV networks.
  • Managed and oversaw a 24-hour emergency response team for both LV and HV network fault rectification. Ensured strict adherence to approved work procedures and safety plans, promptly addressing customer complaints.
  • Oversaw and led inspection teams responsible for preventive maintenance of 11 kV substation equipment; assessed inspection outcomes and provided recommendations for corrective actions to respective departments.
  • Designed and implemented maintenance procedures and documentation for routine tasks, such as HV & LV circuit fault reports, emergency shift daily reports, and inspection checklists.
  • Developed and implemented electrical engineering strategies, plans and designs.
  • Performed troubleshooting of complex electrical systems to identify root cause of issues.
  • Provided technical support for the installation and maintenance of various systems.
  • Investigated customer complaints regarding defective products or services related to electrical system operations.
  • Implemented preventive maintenance procedures for all installed equipment as per manufacturer's specifications.
  • Evaluated existing systems to determine their efficiency and make recommendations for improvement where necessary.

Project Engineer

Alkomed Engineering Services Company W.L.L.
Bahrain
01.2007 - 12.2011
  • Ensured the accuracy and completeness of tender documents for electrical projects by reviewing and analyzing tender drawings and project specifications.
  • Assessed, revised, and submitted project documentation to ensure approval from relevant authorities
  • Prepared and submitted project documentation for approval from relevant authorities, encompassing Method Statements, Risk Assessments, material submittals, project resource plans, and Technical Folders.
  • Procured materials following approval and coordinated inspections to secure authorization for material storage in alignment with project priorities
  • Conducted electrical testing on circuits ranging from 220 kV to 415 V, including equipment such as TX, RMU, ACB, VCB, and LVB.
  • Facilitated meetings with relevant authorities, agencies, and departments to ensure the success of projects.
  • Oversaw site operations, efficiently addressing any site-related concerns in a timely manner, while offering direction to team members on a day-to-day basis.
  • Facilitated smooth project execution by preparing and reviewing monthly reports on cost estimations, work progress, material status, and drawing updates.
  • Ensured efficient communication by establishing and implementing project handover procedures with concerned departments and authorities.
  • Developed project plans, budgets and timelines to ensure successful completion of projects.
  • Managed resources such as equipment, materials, personnel and subcontractors to achieve project goals.
  • Conducted risk assessments and created mitigation strategies for potential risks associated with projects.
  • Provided technical advice and guidance on design concepts and construction methods.
  • Collaborated with stakeholders to identify opportunities for process improvement in the delivery of projects.
  • Resolved conflicts between vendors, contractors, internal staff or other stakeholders related to project objectives.
  • Reviewed blueprints, drawings and specifications for accuracy and completeness prior to construction commencement.
  • Identified cost saving measures that could be implemented without compromising safety or quality standards during the project life cycle.
  • Compiled reports detailing progress updates, budget information and other relevant data related to the assigned project.
  • Verified compliance with applicable regulations throughout each phase of the project life cycle.
  • Coordinated meetings with stakeholders including clients, architects, engineers, subcontractors and other parties involved in the project.
  • Monitored work performance against established milestones ensuring adherence to approved schedules.
  • Prepared change orders when required due to unforeseen circumstances or additional scope changes requested by client.
  • Ensured all necessary permits were obtained prior to commencement of any works on site.
  • Conducted regular inspections at job sites in order to monitor safety protocols being followed by contractors.
  • Maintained accurate records of all expenses incurred during the course of a given project.
  • Negotiated contracts with suppliers and vendors in order obtain best pricing while maintaining quality standards.
  • Documented lessons learned from completed projects which could be used in future endeavors.
  • Maintained project schedule by monitoring project progress, coordinating activities and resolving problems.
  • Supervised installation of materials and equipment for compliance with drawings and specifications.
  • Determined project schedule by studying project plan and specifications and calculating time requirements.
  • Performed testing to determine functionality or optimization.
  • Finished projects on time and within budget.
  • Generated technical reports for customers.
  • Prepared estimates and budgets.
  • Determined design criteria or specifications.
  • Created accurate project specifications, documenting in technical manuals.

Asst. Electrical Engineer

Khalid Electrical and Mechanical Est.
Qatar
04.2004 - 12.2006
  • Monitor daily site activities for multiple projects, ensuring adherence to work plans and quality procedures.
  • Prepare daily reports on resource allocation and utilization, as well as work progress for site activities.
  • Participate in meetings with consultants, clients, and relevant authorities to address and resolve site-related issues.
  • Conducting site inspections and obtaining approvals for completed work in collaboration with consultants.
  • Assist Project Engineer with project documentation across various projects.
  • Coordinate resource allocation, including materials, workforce, and equipment.
  • Track and report on work progress to management, ensuring timely updates.
  • Ensure compliance with safety standards for all site activities.
  • Developed detailed installation plans including conduit routing, cable sizing and termination details.
  • Participated in the fabrication of prototypes from drawings or verbal instructions.
  • Maintained records of work performed using appropriate computer software programs.
  • Documented results from tests conducted during the installation process.
  • Prepared detailed reports based on data collected from testing activities.
  • Collaborated with engineering teams to develop solutions for complex problems encountered during installations.
  • Utilized CAD software to create and revise electrical schematics and layouts.
  • Coordinated with suppliers, contractors, and clients to ensure project success.
  • Provided technical support and troubleshooting for electrical issues, minimizing downtime and enhancing system functionality.
  • Managed electrical project timelines and budgets, ensuring projects were completed on schedule and within financial constraints.

Field Engineer

Techno Group (P) Ltd.
Kathmandu
06.2003 - 04.2004
  • Design and Installation of Cable Tray.
  • Managed the installation and testing of various electrical equipment such as over current relays, control panels, and capacitor banks.
  • Installed Power Transformers, Motors up to 80 HP, and Generators.
  • Industrial Wiring, Cable termination, cable laying.
  • Coordinating with Client and Government Authorities.
  • Provided training to staff members on how to use new systems or troubleshoot existing ones.
  • Ensured compliance with industry standards when designing or implementing solutions.
  • Prepared reports summarizing project status updates for stakeholders.
  • Assessed customer requirements to develop customized solutions that best meet their needs.
  • Managed the team in troubleshooting efforts that alleviated errors.

Trainee Engineer

Nepal Board Ltd
Simara
12.2002 - 05.2003
  • Maintenance of Generator (405 KVA), Transformer 1500 KVA, Circuit Breakers.
  • Collaborated with other departments within the organization to ensure successful completion of tasks.
  • Provided technical support for engineering staff during installation activities.
  • Maintained records of all products tested in accordance with company standards.
  • Study and resolve technical problems.
  • Assisted in the maintenance of equipment used in product manufacturing processes.

Education

MBA (Project Management) -

Alagappa University
India
01.2011

B. Tech. (Electrical and Electronics Engineer) -

NIT Warangal
India
05.2002

Certificate Level in Science -

Board of Intermediate Education AP
India
05.1997

Skills

  • Proficient in communication and interpersonal relations
  • Leadership
  • Logical problem-solving abilities
  • Strong Analytical Aptitude
  • Attention to Detail
  • Creativity
  • Mathematically Inclined
  • Team Player
  • Excellent Technical Knowledge
  • Critical Thinking
  • Electrical Testing
  • Active Learning
  • Organizational Skills
  • Innovative Thinking
  • Requirements Analysis
  • Project Management Procedures
  • Process Improvement
  • Technical Understanding
  • Documentation
  • Safety Management
  • Supervision
  • Microsoft office
  • AutoCAD
  • Ability to Work Under Pressure
  • Decision Making
  • Time Management
  • Self-motivation
  • Conflict Resolution
  • Adaptability
  • Staff Management
  • Electrical Troubleshooting
  • Network analysis
  • Project Management
  • Quality Management
  • Application Development
  • Program Evaluation
  • Team Leadership
  • Microsoft PowerPoint
  • Budget Adherence
  • Technical Support
  • Data Collection
  • Professional Engineering License
  • CAD software expert
  • Technical Writing

Certificatesandlicenses

  • Evaluated as an Electrical Engineer, confirming that continued professional development aligns with the benchmark criteria for Chartered Professional Engineer (CPEng) and Chartered Membership (CMEngNZ) status with Engineering New Zealand.
  • Professional Engineer (Electrical), Certified by Engineers Australia.
  • Licensed as an Electrical Engineer, Reg. No. EPP/MIN/022/EF/47-B, from The Council for Regulating the Practice of Engineer Professional, Bahrain.
  • Licensed as an Engineer (MTC), L. No. – E0245/09 from EDD Bahrain
  • Licensed as HV Authorized Person from EDD Bahrain.
  • Permit to work training level -1 form BAPCO.
  • Certified as OSHA- Auditor
  • ISO Representative (HV Dept., Alkomed).
  • New Zealand & Bahrain Driver license

Traininganddevelopmentcourses

  • Attended finance for non-finance course from 22-26 September 2013 organized by Electricity and Water Authority (EWA), Bahrain.
  • Attended 11KV safe switching practice in 18-22 October 2009 organized by electricity and water authority (EWA), Bahrain Licensed as Engineer (MTC), L. No. – E0245/09 from EDD Bahrain
  • Effectively learned computer aided design and drafting software (Auto-CAD).
  • Learn to use of advance systems such as Geographical Information System (GIS), Responder (complain monitoring system and data bank), Customer Service System (CSS) and SAP (Systems, Applications and Products) during the course of EWA work

Emailaddresses

  • Jeeten02@yahoo.com
  • Jeeten03@gmail.com

Phonenumbers

  • (973) 37738703
  • (973) 360 57474

Languages

Nepali
First Language
English
Advanced (C1)
C1
Hindi
Advanced (C1)
C1
Telugu
Beginner
A1

References

References available upon request.

Timeline

Sr. Electrical Engineer, Distribution & Network Construction

Electricity and Water Authority
10.2017 - Current

Sr. Electrical Engineer, Operation & Maintenance (Emergency Depot, Muharraq)

Electricity and Water Authority
01.2012 - 10.2017

Project Engineer

Alkomed Engineering Services Company W.L.L.
01.2007 - 12.2011

Asst. Electrical Engineer

Khalid Electrical and Mechanical Est.
04.2004 - 12.2006

Field Engineer

Techno Group (P) Ltd.
06.2003 - 04.2004

Trainee Engineer

Nepal Board Ltd
12.2002 - 05.2003

MBA (Project Management) -

Alagappa University

B. Tech. (Electrical and Electronics Engineer) -

NIT Warangal

Certificate Level in Science -

Board of Intermediate Education AP
Jeetendra Gupta