Accomplished professional with extensive expertise in infrastructure design and technical troubleshooting. Recognized as a subject matter expert in performance tracking, disaster recovery planning, and risk assessment. Committed to leveraging technical skills to enhance organizational resilience and efficiency.
Data Protection project, Ahli united bank, Bahrain 2025
· Architecture of a new data protection storage based on Dell Data domain
· Workload analysis of customer’s environment to size a solution that matches security, compliance and regulation measures from the Central bank of Bahrain
· Isolated environment design for Air gap protection of a selected workload
Data Protection project, Benefit company, 2025
· Architecture of a new data protection strategy based on Veritas/Cohesity Flex appliance using the 3+2+1+1+0 compliant Design.
· Workload analysis of customer’s environment to size a solution that matches security, compliance and regulation measures from the Central bank of Bahrain
· Isolated environment design for Air gap protection of a selected workload
Technology refreshment, Bank of Bahrain and kuwait, Bahrain, 2022
· Architecture of a new infrastructure to host customer’s core banking application based on Oracle Sparc servers T8-2 and Dell Powermax.
· Designing a runbook for DR failovers regarding core banking applications and related Databases
· Engaging Ansible in daily tasks automation for admins , ex: Volumes creations , SRDF replication pairs creations , etc…
Technology refreshment, Bahrain Islamic bank, Bahrain, 2021
· Architecture of a highly available solution to host EFTS system based on Citrix VDI and Dell VxRail.
· Architecture of a new infrastructure to host customer’s core banking application based on Oracle Sparc servers T8-2 and Dell Powerstore.
· Designing a runbook for service delivery engineers for workload migrations.
Tech refresh, Bahrain Teleco (Batelco), Bahrain, 2020
· Powermax deployment in main and DR sites
· Metro Protection for active-active data center using dark fiber between sites
· VxRail stretched cluster deployment
· Migrating the existing workload from the traditional vSphere environment to the VxRail
· Converting the Hyper-v machines to vSphere, P2V conversion for the existing legacy servers
Workload migration Vodafone Italy/Albania/Germany, Dell Technologies, 2019
· Migrating workloads from Hitachi to Powermax in most of Vodafone locations worldwide
· SRDF setup between the newly deployed Powermax, Host based migration tools used 'VxVM,LVM,EMcopy,rsync'
Technology refreshment, Gulf stevedoring company, Saudi Arabia, 2018
· Implementation of new Hyperconverged infrastructure in 'Dell VxRail' in 3 Ports in Saudi
· Migrating the existing workload from the traditional vSphere environment to the VxRail, Converting the Hyper-v machines to vSphere
· P2V conversion for the existing legacy servers, Replication using RP4VMs between the sites
Technology refreshment, Ministry of military production, Egypt, 2017
· Replacement of old SAN, NAS, Backup and archiving environment in ministry of defense
· Implementation of VNX, Data domain and Centera and CTA, VDP integration with Data domain
· Workload migration from old SAN storage to the VNX, CTA configuration for file retention and archiving purposes Saudi ports technology revamp
Data Center Relocation, Ministry of interior, Egypt, 2015
· Failover to most of the services from main site to DR site
· Moved all Dell related hardware from the old data center of MOI to the new location
· Cabling, rack, stack, reconfigurations needed for management component
· Failing back to the new main site after all service are up and running.