LIJO SIMON

LIJO SIMON

Indian

Summary

  • A Positive person having 13 Yearsof Oil and gas Engineering and execution experience with EPC contractors.
  • Hand-on experience in managing an area as a project engineer, field engineer, area in-charge, supervision.
  • Managing vendor performances meetings and identifying the critical vendor documents influencing engineering progress especially from the Construction Work Pack point of view.
  • Working with the Engineering Team on general engineering issues of the contract.
  • Review Site Technical Queries and follow up on the closures.
  • Work with Discipline Engineers or clients and identify scopes of improvement in procedures and process flows. The improvements will be recorded or updated based on these discussions.
  • Monitor the quality of engineering deliverables generated and review the deliverables rejected by the client for quality or behavioral issues.
  • Assess the MR to PO Duration and work in coordination with Supply Chain Team and Engineers to improve the time frame
  • Coordinating and conducting meetings with different subcon to achieve target.
  • Participation in MC and PSSR walk and its related meetings

Overview

13
13
years of professional experience
4
4
years of post-secondary education

Work history

Piping supervisor

TechnipFMC
Bapco Modenization Project , BAHRAIN
09.2021 - Current
  • Area in charge in construction activities for structure, piping, painting, insulation, equipment.
  • Monitoring subcontractor activities as per the schedule.
  • Reviewing technical specification of material prior to purchase (Initiating FMR and reviewing PO).
  • Coordinating with client to know the addition requirements in execution phase and communicating with engineering to solve engineering issues in the construction phase.
  • Review the site queries and analyzing for the solutiuon.
  • Supporting subcontractor in material arranging based on MTO.
  • Initiating meeting with Subcon to maintain and achieve progress.
  • Co-ordinating with different disciplines to get the scheduled activities.
  • MC and PSSR walkthrough attendee.
  • Collaborated closely with engineers for precise interpretation and execution of designs.

Construction project engineer

Porotha Corporation
SOLAR POWER PLANT , DUBAI
05.2021 - 08.2021
  • Developed contingency plans as part of risk management strategies, minimised impact of unforeseen circumstances on project delivery.
  • Enhanced project efficiency by overseeing construction processes.
  • Streamlined workflow for improved productivity by implementing advanced engineering techniques.
  • Achieved deadlines with diligent management of construction schedules.
  • Managed construction projects from conception to completion.
  • Oversaw the purchase of project materials, ensuring quality and cost-effectiveness.
  • Conducted site inspections routinely to ensure compliance with design specifications.
  • Monitored project costs to avoid overspending.
  • Motivated site teams to achieve quality results against construction deadlines.
  • Prevented project delays through carefully considered risk and feasibility assessments.

Project engineer piping

Technicas Reunidas
Alzour Refinary, Kuwait
03.2018 - 11.2019
  • Ensuring that all work completed without compromise to quality and is delivered according to the project schedule.
  • Driving interface management, liaising with the Client’s Engineering, Operations and Maintenance staff as required to ensure a consistent approach to project completion.
  • Providing client with an excellent service, by delivering the projects in a safe manner to the agreed schedule dates.
  • Working closely with assets and work pack teams to identify opportunities to release drawings with holds and split work packs etc
  • Review of test packs.
  • Monitored and reviewed vendors and subcontractor’s progress to schedule and work fronts that were available to start or completed

· Conducting meetings with subcontractor to reduce the internal problems for achieving good progress.

· Reporting day to day progression to project manager.

Project engineer

Bahwan Engineering Company
PDO Marmul, Oman
10.2016 - 01.2018
  • Preparing and scheduling unit shutdown.
  • Controlling all the activities in fabrication and painting of all structures and piping including design approval from the engineering consultancy.
  • Preparing early purchase order for pipe, pipe fittings and structural materials in order to complete the project within schedule.
  • Project hand-over document preparation (DOSSIER, ASSISTING IN CCMS CHECKLIST PREPRATION).
  • Attending meetings with client to know their special requirements in project.
  • Coordinating different activities of different departments and assisting commissioning activities.
  • Optimised project performance by implementing efficient engineering solutions.
  • Identified potential risks for proactive mitigation and avoidance of project delays.

Piping engineer

Nasser S AL Hajri
Sadara, Saudi
02.2016 - 07.2016
  • On site assignment in a subcontractor role for pre-com activities.
  • Responsible for line checking of system piping for completeness as per P& ID.
  • Perform pipe flushing and blow down after hydro/leak test has been completed.
  • Perform leak and pressure test as per company accepted procedure.
  • Perform purging inerting and drying out of lines.
  • Reinstatement of fitting and equipment prior to line completion.
  • Clearing of final punch list.
  • Attending meetings to discuss about punch list and status.

Piping engineer

Nasser S AL Hajri
Sabic, Saudi
06.2014 - 02.2016
  • On site assignment in a subcontractor role for piping construction activities up to commissioning phase.
  • Review PID in conjunction with the piping specification to verify pressure test package limits, line checking to confirm isometric requirements and initiates action from construction section of deficiency punch list.
  • Control for hydro and pneumatic testing of pipelines.
  • Verifies red marks on ISO-drawings and P&ID test diagrams.

Piping engineer

Dowel Erectors
500*2 MW Thermal power plant, India, Tamil Nadu
06.2011 - 05.2014
  • Supervising the pipe erection job as per isometric and verifying it with the P&ID.
  • Assigned in installation of high-pressure steam lines.
  • Do material take-off in accordance with specification.
  • Review the progress of piping activities.
  • Supervise erection of the piping construction and related matters.
  • Direct and control welding foremen/ supervisors for area of construction.
  • Coordinate with Engineers to ensure all piping erection as per schedule.
  • Ensure all materials are available as per B.O.M.
  • Update and monitor progress status as per submitted daily accomplishment and welding report.

Education

Bachelor of Technology - Mechanical Engineering

Caarmel Engineering College
India
05.2007 - 08.2011

Skills

  • Microsoft software knowlwdge( Excel, Word,Power point, Power bi, planner, List)
  • Leadership excellence
  • Project management expertise
  • Technical drawing interpretation
  • Critical decision making
  • Decision making capacity
  • Project lifecycle awareness
  • Mechanical engineering knowledge
  • Proficiency in ms project
  • Structural analysis
  • Subcontracting management
  • Client relations
  • Scope management
  • Field support
  • Project leadership
  • Performance monitoring
  • Client relationship building
  • Multidisciplinary teamwork
  • Technical understanding
  • Piping system knowledge

Languages

English
Proficient (C2)
Hindi
Fluent
Malayalam
Native
Tamil
Fluent

Timeline

Piping supervisor

TechnipFMC
09.2021 - Current

Construction project engineer

Porotha Corporation
05.2021 - 08.2021

Project engineer piping

Technicas Reunidas
03.2018 - 11.2019

Project engineer

Bahwan Engineering Company
10.2016 - 01.2018

Piping engineer

Nasser S AL Hajri
02.2016 - 07.2016

Piping engineer

Nasser S AL Hajri
06.2014 - 02.2016

Piping engineer

Dowel Erectors
06.2011 - 05.2014

Bachelor of Technology - Mechanical Engineering

Caarmel Engineering College
05.2007 - 08.2011
LIJO SIMON