Project Quality, Management, Expedition
15 Years international experience in Project Quality Control, QA, Welding technology, Project coordination, Project follow-up and expedition. Oil and Gas sector experience in workshop, site, onshore, offshore and shutdown .
Develop new PQR, WPS as per construction code and client specification in different materials.
P1 SA516 GR60/70 P4
SA387 GR11 CL1
P5A SA387 GR22 CL2
P7 SA240 TP410S
P8 SA240 TP304/316/321
P9B SA203 GR E
P10H SA240 UNS 31803
P42 SB127 UNS 04400
P43 SB168 UNS 06025
P45 SB366 UNS 08825
P51 SB265 GR 2
API 5L X52 MS (Offshore Pipeline)
Mechanical testing witness
Documents approval from client and Third party
Qualify welders and welding operator as per client specification and construction code.
Analysis of Weld Repair Rate in the shop & take necessary action to minimize the repair rate and to improve project quality.
Certifies, Train and Educate Welders, Welding Supervisor and Welding Inspector with providing technical inputs to various levels in the shop floor.
U U2 R-Stamp audit experience with LRA, HSB and ABS.
Welding consumable estimation, TDC preparation, consumable procurement, consumable storage and baking as per Quality Manual, Consumable MTC review.
Providing technical information/clarification after analyzing the raw
material of the equipment to the proposal team at the time of bidding.
Visual inspection of welds.
Welding machine calibration.
Preparation of ITP and all other inspection procedures.
Preparation of Quality & Welding Documents such as Material Summary, Weld Map, NDT Summary, Dimension reports, Weld Repair Procedure
(Final Dossier).
Incoming Raw Material Inspection and MTC review.
Stage wise inspection of Vessel, Heat exchanger, Columns, Storage tanks, Piping Module.
Inspection of Pipe fabrication activities, Long seam / Circ Seam set up, Nozzle set up, Visual Examination before and after welding, R.F. Pad Leak
test, Hydro test, etc.
PWHT requirement inspection and chart review of Stress Leaving, Normalizing, Solution Annealing, Quenching, Tempering, Step Cooling.
Inspection of Composite cylinders as per ISO 11119-2013.
Uthmaniyah Gas Plant UGP Shutdown
Repair work in columns such as weld buildup, nozzle replacement. Repair in Heat exchanger tube bundle replacement
Heat Tube Replacement
Replacement of Convection coil and radiant coil, Install new MOC piping
Vessel Installation
Installation of new equipment at site. Connection line weld and NDT. Final dimension and Hydro test.
Filter, Drum, Column repair, Nozzle replacement as per ASME R stamp Tube replacement in the heat exchanger, 12" Line connection, Column Weld Buildup
Reactor Repair
Top Head replacement of Column, Air cup new weld and repair existing air cup as per inspection report.
Project QA QC, Welding, Expedition experience
undefinedProject Quality, Management, Expedition