Experienced professional with expertise in Primavera P6 for preparing construction programs, resource and cost loading, and generating S Curves. Proficient in creating detailed progress reports, both monthly and weekly, for clients and consultants. Skilled in forensic analysis for extension of time (EOT) based on delays, risk analysis using Excel, Power BI, and Primavera Risk Analysis. Adept at reviewing BOQs, preparing monthly valuations, and managing commercial issues. Strong knowledge of Excel functions including histograms, conditional formatting, and various count and sum formulas. Career goal includes leveraging extensive skills in project management to drive successful construction projects.
Overview
31
31
years of professional experience
1994
1994
years of post-secondary education
Work history
Sr. Planning Engineer
Mohammed Jalal Contracting Company
Bahrain
12.2024 - 01.2026
Sr. Planning Engineer
Iacovou Construction
Bahrain
10.2022 - 09.2024
Development project for Qalali Beach Front
Sr. Planning Engineer
Sayed Khadem Al Durazi
Bahrain
04.2022 - 10.2022
Extension of Maam’er Culvert
Wadi Al Buhair Infra structure works
Bahrain Bay Infra Structure
Sr. QS/Planning Engineer
Al Hassanain Co. B.S.C.(c)
Bahrain
12.2019 - 12.2021
North Manama Causeway Phase 2 and Busaiteen link (Package-02)
Naseej Marine and Reclamation Works, Amwaj Island
Phase 2A Primary Infra Structure (DGS)
Head of Planning Department
Hafeera Contracting Company
Bahrain
09.2017 - 10.2019
Infra Structure Works at Asst 13A. Diyar Al Muharraq
Contractor: China Harbour Engineering Company (CHEC)
Construction Supervision and Project Management of Civil Marine works project at King Fahd Causeway Authority Island – A, Reclamation and infrastructure Project
Civil Marine Works construction; Dredging and Reclamation work, Rock Revetment, Construction of Quay Wall, Spillways, Construction of Marina, Offshore Piling, Sea Water Intake / Outfall Structure and Marine pipelines.
Planning Engineer / Delay Analyst
G.P. Zacharides Civil Engineering & Building Contractors
BAHRAIN
01.2011 - 06.2015
Delay Analysis for Durrat Al Bahrain Project – 318 Villas (Bahrain)
Banader Hotel at Manama-Bahrain
Sewage Treatment Plant (STP) at Muharraq
Sewer Treatment Plant: Construction of Sewer Treatment Plant includes Terminal Lifting Station, Sequencing Batch Reactor(A & B), Intermediate lifting Station, Treated Sewage Effluent, Buffer Tank, Disk filter, UV Contact tank, Liquid Sludge Feed Tank, Ferric Chloride(FeCL3) tank, Pre-treatment Station, Odour Control System, Waste Facility, Mixing Chamber(Out fall Basin), Fuel tank and General Civil Works
Deep Gravity Sewer: Deep Gravity Sewer (DGS) work consist of construction of more than 70 Shafts. Work include protection of utility services and relocation, construction of Guide Wall, Secant Piles, Capping beam and temporary fencing for covering work location. Shaft excavation, ring beam, base slab and dewatering works. Construction of soft eyes, Micro-Tunnelling between shafts (jacking) to shaft (receiving) with Tunnel Boring Machine (TBM). Turn around Works (Soft Eyes and Micro-tunnelling) and repeated works. Manholes and backfilling works, reinstatement works and shaft handover
Job Description:
Control, monitor and reviewing project progress with all departments for all activities related to the project planning.
Review all planning report e.g. daily, weekly, monthly and executive reports which are prepared on site and head office.
Attend and prepare for meetings at site and head office and with higher management level.
Prepare project summary and detailed bar chart schedule, resource requirement (e.g. manpower, equipment, BOQ’s), histograms and S-Curves covering project major items such as mobilization, Engineering (Design submittal), contracts status, procurement (local and long lead items) construction works, time of completion and hand over process.
Evaluating the impact of design changes and variation orders on project program and claim for extension of time (EOT) based on excusable and non-excusable delays.
Comparison of Baseline programme Vs Time Impact Programme for Claim analysis.
Prepare review and submission of Final As - Built Programme in Primavera (P6).
Prepare review and submission of Baseline Programme Vs Time impact Programme Vs As-Built Programme in Primavera (P6) for arbitration.
Planning Engineer
Cyprus Cybroc & Tabet JV WLL
Bahrain
06.2006 - 12.2010
Riffa Views Infra Structure Works @ East Riffa, Bahrain- Contract Amount 35 Million Dinars with total area 977000 m2 and Internal road length 20 km Bulk Earth Works, Sewer Net Work compromising Sewer Pumping Station (03 No), Drainage Net Work, Potable Water Net Work compromising Potable Water Tank(4000m3) & Potable Water Pumping Station,11 KV Distribution Work compromising of Substation(40 No’s),LV Distribution Work, Street Light Net Work, Telephone Net Work, Roads and Paving Work, Boundary Wall and fence
Job Description:
Preparation of the Program for the works under the guidance of Planning Manager in liaison with Project Manager and Infra Structure Manager.
Planning of the works in compliance with contract conditions and requirements (Completion and access dates, specified sequence of activities.)
Planning the resources with due consideration to the company’s existing resources and resource policy.
Monitoring the progress and reporting to the Project Manager on progress achieved as compared to progress planned and effect on completion date.
Preparing weekly progress reports and monthly progress reports.
Conduct site visit & site meetings to update/appraise actual project accomplishments.
Assisting Project Manager in managing delays.
Updating the program taking into consideration variations, changes in methodology, actual progress as the need arises and as requested by Project Manager.
Ensuring that progress of work is in accordance with the Project Program.
Quantity Surveyor
Oman Shapoorji Construction Co. LLC
Sultanate of Oman
09.2005 - 05.2006
Palace Villa for Sultan Quboos @ Bait Al Mamurah, Salalah
Residential Facilities for Saud Bhawan Group at Wadih Kabeer
Senior Civil Engineer
Ramco Trading & Contracting Company WLL
Doha
01.2004 - 07.2005
Construction of (B+G+25) REGENCY TOWER with Total Plot Area of 7625 Sq. m and Total Built - Up Area 53,872 Sq. m with 286 flats at Doha
Project Engineer
Al Yusr Town Send & Bottom Company WLL
Riyadh
01.2002 - 12.2003
Construction of TPF (titanium chloride production facility) plant, Linde/Linarco, SABIC. Riyadh.
Responsible to the Project Manager for the civil construction of a TPF(titanium chloride production facility) plant Including substantial site preparation works, 35,000 cubic metres of reinforced concrete, 6,000 tons of steelwork,( from pipe racks to 80m structures ), heavy lifts, HVAC, warehouse (20,000 sq. metres), underground services, utilities, roads and finishes. Completed within 22months from commencement with a labour force of 1,000 plus
Project Engineer
Nasir Awad Al-Yami Co.
Al Hufof
01.2000 - 12.2001
Supervision of Infra Structure Works, roads & other housing lots of Saudi Aramco Contract # 53039 at Al Dhahran Aramco.
Job Description:
Preparation of work orders, material requests and site meetings.
Preparing daily reports & weekly reports for Saudi Aramco meeting.
Managing site work as per available manpower, material within required time.
Coordination with Saudi Aramco Management for regular flow of work.
Maintenance Engineer
Al Jubal
03.1998 - 12.1999
Maintenance of Royal Commission Building, Al Jubal, KSA
Job Description:
Preparation of work orders, material requests and site meetings.
Preparing daily reports & weekly reports for Royal Commission meeting.
Managing maintenance work as per available manpower, material within required time.
Site Engineer
Kaveri Projects Ltd.
Hyderabad
08.1994 - 02.1998
Hyderabad Stock Exchange (B+G+7 Complex)
Education
Bachelor of Engineering - Civil Engineering
Osmania University
Hyderabad, India
Project Management Planning (PMP)
Skills
Primavera p6 for preparing construction programs, Resource loading, Cost Loading, S Curves, Planned Vs Actual Percentage for client/consultant meeting Curve and Histogram for Planned Vs Actual Vs Forecast amount
02 Weeks look a Head program and 01 monthly look ahead program
Working closely target monthly valuation amount and Primavera Program including monthly cash flow
Monthly progress Reports and weekly Progress reports for client and consultant
Progress photos in power point
Identifying and weighing up commercial issues
Extension of time (EOT) based on excusable and Non-Excusable delays, Forensic Analysis
Excel Knowledge: Histogram, Curves, Conditional Formatting, Usage of Count if, Count ifs, Sum if, Sum ifs for preparation of Various excel sheets
Review BOQ and prepare monthly valuations
Follow suppliers for Quotations and process till material delivery
Track changes in plans or constructions; updates
Risk Analysis – Excel and, Power bi, Primavera Risk Analysis
Primavera Risk Analysis: Risk Register, Premitigated and Post Mitigated Risks, Distribution Analyzer, Tornado Chart (Duration Sensitivity, Cost Sensitivity, Criticality Index, Duration Cruciality, Schedule Sensitivity Index
Affiliations
The council for regulating the practice of Engineering professionals (CRPEP)
Bahrain: June 2021 to June 2022 (CPR: 711033560)
Valid Driving License (Bahrain)
AREA OF EXPERTISE
High rise buildings and Housing Complex, Infrastructure Works, Reclamation and Revetment Works, Roads and other Housing lots, Sewerage Network covering Sewerage treatment Plant and Deep gravity system, Plant Construction
Project Planning, QS, Supervision, monitor and control.
Has over 31 years of experience in various construction projects.